Basics
Coordinate among Project Stakeholders
Most projects that encounter troubles later on, do so, because of the lack of preliminary coordination! Organize a BIMCoordination meeting to agree upon the following:
- project location and coordinates
- Project North direction
- Story setup
Prepare a BIM Manual and share it with all the stakeholders. The BIM Manual should include:
- The stakeholders and their exact responsibilities
- The data exchange protocol
- The data agreed upon at the BIM coordination meeting
- project specific BIM requirements
Set Element Parameters
- Define the Structural Function of the element
- Set the Position of the element within your project
- Set the IFC Classification of your element
- Enable the necessary IFC properties for the element or create mapping rules
Organize Elements
- Make sure all project elements are assigned to proper layers.
This will enable you to easily hide elements that you do not wish to include in the IFC.
- Hide all layers that do not contain elements relevant to your consultant receiving the IFC.
EXAMPLE: (e. g. signage, furniture, vegetation)
- Create a layer combination from the step above.
- Save a 3D view of your project that uses the previously created layer combination.
This will allow you to easily switch to a view from which you can save your IFC.